From 5b0311e1f2464547fc6f17a82d7ea2538c8c7a70 Mon Sep 17 00:00:00 2001 From: Frederic Weisbecker Date: Sun, 17 Jan 2010 11:59:13 +0100 Subject: [PATCH] perf: Allow pinned and flexible groups to be scheduled separately Tune the scheduling helpers so that we can choose to schedule either pinned and/or flexible groups from a context. And while at it, refactor a bit the naming of these helpers to make these more consistent and flexible. There is no (intended) change in scheduling behaviour in this patch. Signed-off-by: Frederic Weisbecker Cc: Peter Zijlstra Cc: Paul Mackerras Cc: Ingo Molnar Cc: Arnaldo Carvalho de Melo --- Reading git-format-patch failed