From a8302de934b5d1897ff146cd0c7ab87d1417c092 Mon Sep 17 00:00:00 2001 From: Vasanthakumar Thiagarajan Date: Fri, 9 Jan 2009 18:14:15 +0530 Subject: [PATCH] mac80211: Handle power constraint level advertised in 11d+h beacon This patch uses power constraint level while determining the maximum transmit power, there by it makes sure that any power mitigation requirement for the channel in the current regulatory domain is met. Signed-off-by: Vasanthakumar Thiagarajan Signed-off-by: John W. Linville --- Reading git-format-patch failed