sched: Fix sched rt group scheduling when hierachy is enabled
authorBalbir Singh <balbir@linux.vnet.ibm.com>
Thu, 3 Mar 2011 11:34:35 +0000 (17:04 +0530)
committerGreg Kroah-Hartman <gregkh@suse.de>
Mon, 14 Mar 2011 21:17:39 +0000 (14:17 -0700)
commit 0c3b9168017cbad2c4af3dd65ec93fe646eeaa62 upstream.

The current sched rt code is broken when it comes to hierarchical
scheduling, this patch fixes two problems

1. It adds redundant enqueuing (harmless) when it finds a queue
   has tasks enqueued, but it has no run time and it is not
   throttled.

2. The most important change is in sched_rt_rq_enqueue/dequeue.
   The code just picks the rt_rq belonging to the current cpu
   on which the period timer runs, the patch fixes it, so that
   the correct rt_se is enqueued/dequeued.

Tested with a simple hierarchy

/c/d, c and d assigned similar runtimes of 50,000 and a while
1 loop runs within "d". Both c and d get throttled, without
the patch, the task just stops running and never runs (depends
on where the sched_rt b/w timer runs). With the patch, the
task is throttled and runs as expected.

[ bharata, suggestions on how to pick the rt_se belong to the
  rt_rq and correct cpu ]

Signed-off-by: Balbir Singh <balbir@linux.vnet.ibm.com>
Acked-by: Bharata B Rao <bharata@linux.vnet.ibm.com>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
LKML-Reference: <20110303113435.GA2868@balbir.in.ibm.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Greg Kroah-Hartman <gregkh@suse.de>
kernel/sched_rt.c

Simple merge